2018-02-08 Shipment | 274 Liters Thermal Shock Chamber Two Zones

Today we are doing the shipment for an Europe customer. The customer ordered 3 units thermal shock chambers. Testing Volume: 274 Liters, Testing Room Size: W650D650H650mm, Temperature Range: -65C + 180C, Voltage: 440V, 50Hz. This is a custom design, The testing room movement from the left to right.


So far as I know, The original and traditional design is up and down movement, But we are different design. If you are the professional engineer and familiar with the shock testing, You will understand that our solution is more reasonable if the customer requested a power on test. There has a 100mm diameter testing hole on the left side of the thermal shock chamber. The main purpose is making the flexible flat cable across into the testing room during the power on for testing samples.


2018-02-08 Shipment

Customer Order Quantity: 3 Pieces
Testing Volume: 274 Liters
Testing Room: W650 * D650 * H650mm
Temperature Range: -65℃ + 180℃
Cooling Type: Air Cooling
Temperature Recover: 3 ~5min (non-linear, without load)
Temperature Change: ≤10 Seconds
Temperature Deviation: +-2.0℃(≤+150℃)+-3.0℃(>+150℃)
Preheating Temp: ﹢25 ℃ ~﹢100 ℃∕ 30 min;
Precooling Temp: ﹢25 ℃ ~﹣45 ℃ ∕ 40 min,
Samples Weight: Able to manage sample of 60 kg,
Defrosting Requirement: Able to not carry out defrosting process during 60 cycles (-40°C/1.5 h; 150°C/1.5 h)
Testing Hole Request: Testing hole for power on test 100 mm diameter
Voltage, Power Supply: AC 440V, 60Hz

Normally, We make the environmental chamber’s testing hole with 50mm, But this 3 units we make the testing hole with 100mm. Becuase the customer request power one test, and their power lines is flexible flat cable, The 50mm diameter is not enought to make the flat cable across into the testing room.


Wewon Environmental Chambers Co., Ltd. as a manufacturer and supply environmental test chambers for abroad partners many years ! The mainly product from Wewon Environmental Chambers Co., Ltd. : environmental test chambers, temperature humidity chambers, walk-in chambers, thermal shock chambers, xenon test chambers, ozone test chambers, & vibration test systems. Many thanks for your reading ! I appreciate it !


2018-02-08 Shipment

The lead time for this 3 units thermal shock chambers are urgent ! Customer request an air shipping way. We have no problem to help the customer to make a perfect air shipment ! We have a good and strongly logistics dept and help us delivery the thermal shock chambers to Hong Kong airport from our factory. After 2 ~ 3 days air flight, Then the customer received the thermal shock chamber finally. It’s very fast and no need waiting, Compare with the sea shipment.


In fact, These thermal shock chambers has the Freon inside. And fan motors at the back side of the electronic plate area. Because of this, How to communicate with the Hong Kong air lines, comes to be a professional topic and you need to solve this. This is not the easy job for an young people who has no experience on how to do an equipment delivery work with Freon inside. If you are not the professional logistics suppliers, You will not understand what I have explained.


2018-02-08 Shipment

Most of the workers and engineers working in Wewon Environmental Chambers more than ten years ! No one can be success by a simple words ! The professional engineer will do the perfect job finally. I think you can believe and trust our professional workers according to the below packing photos. Right ?


We use the plywood material to make sure there has no limit for custom clearance purpose. The bottom tray will make the cross structure design. This will make the fork-lift truck driver can carry on this tray more easier. This is a humanized design and we are enjoying it. I am glad to know you have the inquiry for Wewon environmental chambers. The related data as above files mentioned, Hope you like it ! For more details check, Please send us a mail. I am waiting for you there ! Thank you


2018-02-08 Shipment

We equip the stainless steel cover on the glass window. The customer request to do the laser testing work. In order to avoid the laser shot off from the glass window, There may has the risk to hurt the operator’s eyes. We equip a stainless steel cover on the window to solve this problem.


In fact, There has many environmental chambers manufacturers, None of them has a solution on this point, But we have. It not means we are much better than the other environmental chambers manufacturers, We are friendly and positively when the customer has a special requirement, We will try our best to meet the customer’s technical request.


THERMAL SHOCK CHAMBERS SHIPMENT 1

Thermal Shock Chambers Ready for Shipment

THERMAL SHOCK CHAMBERS SHIPMENT 2

Thermal Shock Chambers Finshed Packing

THERMAL SHOCK CHAMBERS SHIPMENT 3

Thermal Shock Chambers, The Loading Time 1

THERMAL SHOCK CHAMBERS SHIPMENT 4

Thermal Shock Chambers, The Loading Time 2

© Copyright 2014-2023. Wewon Environmental Chambers Co., Ltd.